It is not always possible to install concrete floating floors...
The additional mass and point loading that a floated concrete slab can provide often makes it unsuitable, particularly within existing structures. In these cases, layers of chipboard and cement particle board can be combined to provide a stable floated floor.
The more mass that can be added to the floating floor the better the performance will be, however the build-up will often be limited by the available space and load capacity of the structure. These systems are often installed within pre-existing buildings with minimal disruption to adjacent areas.

Example of System Build Up
Click on the circles to view details about our Anti Vibration Dry Flooring system.
Thermo Edge Perimeter Strip
Acoustic Mineral Wool
Anti Vibration Block
Slab
Timber Batten
Metal Channel
Dry Screed T&G Board
Chip Panel
Supply & Install System
Compliance
N/A
Building Regulations
N/A
Moisture Resistant
N/A
Soundproofing Use
Impact & Airborne
Applicable Projects
New & Refurbishment
Got A Project? Request A Quote Today!
Simply fill in your details and click ‘Request Quote’ and a member of our team will in touch to discuss your project.